What we fit
Home EV charger installation in Cheshire.
A home charger turns charging into something that happens while you sleep. The car is full every morning, at whatever your overnight rate is, and you stop planning journeys around other people’s chargers.
Every home EV charger installation we do across Cheshire can do something better still when it sits alongside solar: charge on what the roof is making rather than what the grid is selling.
In short
Since the Electric Vehicles (Smart Charge Points) Regulations 2021, a home charger has to be smart: it comes with default charging hours set outside the weekday peaks (8 to 11 in the morning and 4 to 10 in the evening), the owner can override them, and it applies a random delay of up to ten minutes to each charge. A 22 kW charger needs a three-phase supply and most UK homes are single phase, so a home charger is normally 7 kW or so; Hypervolt publishes its Home 3 Pro at 7.4 kW single phase. In England a wall charger is normally permitted development, with new rules from 21 October 2026; in Wales the 2019 rules apply. A home charger is notified to the network operator. Under the Energy Networks Association’s connect-and-notify process, where the home’s maximum demand stays at 60 amps per phase or less the charger is fitted first and notified within 28 days; above that, the operator is asked first.
Smart Charge Points Regulations 2021 · SI 2026/1056 · Energy Networks Association
The roof studio
Turn the house, fill the roof.
A Cheshire semi on a turntable. Drag it round, then tell it about your roof and your house — the panels, the battery, the current running through it and the numbers all move together.
01Your roof
02Your house
Estimated generation
3,870
kWh a year
Estimated saving
£834
a year, saved and earned
Estimated payback
10.1
years
System size
4.40 kWp
Panels
10
Your use covered
58%
Of what the roof generates
Worked out for a typical Cheshire roof at the pitch and aspect you picked, on a unit rate of 28p and an export rate of 6.5p — rates this tool assumes, dated September 2026, rather than any tariff you have been offered. Nothing here is a quotation: your roof, your shading and how much electricity you use while the sun is up are what the survey settles.
Take the figures with you.
Copy what the studio worked out for your roof, or send it straight to us with a survey request. None of it is a quote: the survey replaces every figure above with your own.
Every assumption behind the numbers
- Unit rate
- 28p for every unit (kWh) you’d otherwise buy from the grid.
- Export rate
- 6.5p for every unit the house and battery can’t use and send back to the grid.
- Your yearly use
- Worked out from your monthly bill at the 28p unit rate, after a standing charge of about 36p a day — and never less than 1,100 kWh a year.
- What a panel makes
- Each panel is 440 W (0.44 kWp). A kWp makes 880 kWh a year facing south, 760 facing east–west and 620 facing north-ish. For this part of Cheshire the EU’s PVGIS model gives 951 for a south roof at a typical pitch — the studio stays below it.
- Pitch
- Shallow (28°) makes 95% of a typical 38° roof; steep (48°) makes 97%.
- Shading
- A bit of shade costs 10%; heavy shade costs 24%.
- How many panels
- Two rows, growing with your bill from three columns to eight — six panels up to sixteen.
- How much you use yourself
- The share of what the roof makes that the house uses: 30% if you’re usually out, 46% in and out, 62% usually home. A battery adds 24 points and a car charger 6, up to 86% — and never more than 62% of your whole year’s use.
- Saving
- The units you use yourself at 28p, plus the units you export at 6.5p.
- Payback
- The yearly saving set against what a system like the one you’ve built typically costs to install: a base figure, an amount for each panel, and more again for a battery or a charger. The answer is held between 4 and 25 years. The studio never shows that cost, because only a survey can price your roof — so treat the years as a rough guide, not a figure to hold us to.
Monthly and yearly sunshine for this area: PVGIS 5.2, EU Joint Research Centre. The unit rate, the export rate and the standing charge are the studio’s own assumptions, set in September 2026 — not a tariff we have quoted you. Your own rates are on your bill, and a survey works from those.
EV charging
Charging on your own generation.
A solar-aware charger watches what the house is exporting and puts that into the car instead. On a good day the surplus does the work; on a dull one the charger tops up from the grid at whatever rate you have chosen.
That is a setting, not a slogan: Hypervolt publishes an Eco mode that puts solar and home-battery energy first, and a Super-Eco mode that uses nothing else. Which suits you depends on your supplier and how far you drive.

EV charging
What we check before quoting.
- The incoming supplyThe main fuse and the board decide what can be added and whether load management is needed. This is the check that stops a charger tripping the house every evening.
- The routeWhere the cable can run so it is protected, tidy and not across a doorway or a drive that gets dug up next spring.
- Where the car parksTethered or socketed, which side the car’s inlet is on, and whether the cable will reach without being dragged over a wall.
- EarthingAn outdoor charge point needs the right earthing arrangement for the supply it is on — usually a device that monitors it and disconnects if the supply goes out of limits.
- The networkCharge points are notified to the network operator. We do that; you do not chase it.

EV charging
Answers to the three questions we get most.
- “Will it charge overnight?”
- Yes, and most tariffs make that the cheapest window. The charger can be told to work only inside it.
- “Can it use my solar?”
- If the charger supports surplus diversion, yes — that is exactly what the eco modes are for.
- “Do I need a special cable?”
- A tethered unit brings its own. A socketed unit takes the cable that came with the car.
EV charging
Fitted to be lived with.
The unit goes where you actually park, at a height that suits whoever uses it, with the cable dressed so it is not lying in a puddle. The isolation is labelled, the route is protected, and the board is left tidier than we found it.
We fit Hypervolt and the Tesla Wall Connector.

EV charging
How a charger job runs.
- 01CallThe car, the parking, the board. Most of it can be settled in ten minutes, and photographs help.
- 02CheckSupply, earthing and route confirmed on site before anything is ordered.
- 03InstallUsually half a day. Mount, wire, protect the run, test, and label what we have added.
- 04Set upApp, schedule and — where it applies — the solar surplus mode, set up with you before we leave.
What we fit on these jobs
The kit, and the rest of the work.
From the Google profile
Homeowners on this work.
10 of our 39 Google reviews mention EV charging. Here are 8 of them, word for word.
Asked on every survey
EV charging, the questions first.
If yours isn’t here, give us a ring and ask, or see every question.
Installing a home EV charger means you can skip the hassle of public charging stations, waking up every day to a fully charged car that’s ready to go. EV charging at home is not only more affordable but also energy-efficient, especially when paired with a solar PV system.
Yes — we offer EV charger installation for homes and businesses, and help you select the right charger for your needs before installing it.
From the blog
Worth reading before you decide.

The best home EV charger for you: a buyer's checklist
Not a ranking: our checklist for any home EV charger. Smart rules, cable style, 7 kW or 22 kW, solar modes, load management, PEN protection, tariffs.
19 October 2026

EV charger grants in 2026: who qualifies and who doesn't
The 2026 EV charger grant is for renters and flat owners with off-street parking. Who qualifies, who doesn't, how it's claimed, and the on-street grant.
19 October 2026

EV charger installation cost: what decides it
What decides the cost of installing an EV charger at home: your supply and main fuse, the cable run, earthing, the cable style and the paperwork.
19 October 2026
Where we do it
EV charger installation, town by town.
From our base in Ellesmere Port, across Cheshire, Merseyside and Greater Manchester. The towns nearest us come first.
- EV charger installation across CheshireEllesmere Port · Helsby · Neston · Chester
- EV charger installation in BirkenheadBebington · Heswall · Birkenhead · Liverpool
- Stockport EV charger installationAltrincham · Manchester · Stockport
Cheshire
- EV chargers in Ellesmere Portunder 2 milesCheshire West and Chester
- EV chargers in Helsby6 milesCheshire West and Chester
- EV chargers in Neston6 milesCheshire West and Chester
- EV chargers in Chester7 milesCheshire West and Chester
- EV chargers in Frodsham8 milesCheshire West and Chester
- EV chargers in Runcorn8 milesHalton
- EV chargers in Widnes9 milesHalton
- EV chargers in Mold13 milesFlintshire
- EV chargers in Tarporley13 milesCheshire West and Chester
- EV chargers in Warrington15 milesWarrington
- EV chargers in Northwich17 milesCheshire West and Chester
- EV chargers in Winsford17 milesCheshire West and Chester
- EV chargers in Wrexham17 milesWrexham
- EV chargers in Middlewich20 milesCheshire East
- EV chargers in Nantwich22 milesCheshire East
- EV chargers in Knutsford22 milesCheshire East
- EV chargers in Crewe24 milesCheshire East
- EV chargers in Sandbach25 milesCheshire East
- EV chargers in Wilmslow28 milesCheshire East
- EV chargers in Congleton30 milesCheshire East
- EV chargers in Macclesfield32 milesCheshire East
The kit we fit in Cheshire: Hypervolt installer, Cheshire.
Merseyside and the Wirral
- EV chargers in Bebington4 milesWirral
- EV chargers in Heswall8 milesWirral
- EV chargers in Birkenhead9 milesWirral
- EV chargers in Liverpool9 milesLiverpool
- EV chargers in Wallasey11 milesWirral
- EV chargers in West Kirby13 milesWirral
- EV chargers in Hoylake13 milesWirral
- EV chargers in St Helens14 milesSt Helens
- EV chargers in Southport25 milesSefton
The kit we fit in Merseyside & Wirral: Hypervolt installer, Merseyside & Wirral.
Greater Manchester
- EV chargers in Altrincham24 milesTrafford
- EV chargers in Manchester30 milesManchester
- EV chargers in Stockport32 milesStockport
The kit we fit in Greater Manchester: Hypervolt installer, Greater Manchester.
Before the survey: EV charger grants in 2026 · Do you need planning permission for an EV charger? · Choosing a home EV charger.
Home EV charger installation across Cheshire, Merseyside and Greater Manchester, from our base in Ellesmere Port.
Start here
Start with a conversation, not a quote.
Tell us the postcode and roughly what you use. We’ll tell you honestly whether the roof is worth doing — and if it isn’t, that’s a perfectly good answer too.
- Takes about a minute
- You get a person, not a brochure
- No obligation, and no visit until you ask for one

