Where we work

Solar panels in Cheshire and North WalesSolar, batteries and EV chargers across Cheshire.

Cheshire is home ground: we are based in Ellesmere Port, seven miles from Chester, and we fit solar panels across the county and over the border into North Wales at Wrexham and Mold, where the planning rules are Welsh.

Towns on the map
21 · 19 in Cheshire, 2 in North Wales
Distance
under 2 to 32 miles from Ellesmere Port
Planning authorities
6
Fourteen black panels on a tiled roof in low evening sun, a chimney beside them
Fourteen panels on a tiled roof in the evening sun

Cheshire

Every town we cover here.

Straight-line distance from our base in Ellesmere Port, nearest first.

The roof studio

Turn the house, fill the roof.

A Cheshire semi on a turntable. Drag it round, then tell it about your roof and your house — the panels, the battery, the current running through it and the numbers all move together.

01Your roof

Which way the roof faces
Roof pitch
Shading

02Your house

£120 a month
Home during the day?

Estimated generation

3,870

kWh a year

Estimated saving

£834

a year, saved and earned

Estimated payback

10.1

years

System size

4.40 kWp

Panels

10

Your use covered

58%

Of what the roof generates

Used in the house70% Exported30%

Worked out for a typical Cheshire roof at the pitch and aspect you picked, on a unit rate of 28p and an export rate of 6.5p — rates this tool assumes, dated September 2026, rather than any tariff you have been offered. Nothing here is a quotation: your roof, your shading and how much electricity you use while the sun is up are what the survey settles.

Take the figures with you.

Copy what the studio worked out for your roof, or send it straight to us with a survey request. None of it is a quote: the survey replaces every figure above with your own.

Every assumption behind the numbers
Unit rate
28p for every unit (kWh) you’d otherwise buy from the grid.
Export rate
6.5p for every unit the house and battery can’t use and send back to the grid.
Your yearly use
Worked out from your monthly bill at the 28p unit rate, after a standing charge of about 36p a day — and never less than 1,100 kWh a year.
What a panel makes
Each panel is 440 W (0.44 kWp). A kWp makes 880 kWh a year facing south, 760 facing east–west and 620 facing north-ish. For this part of Cheshire the EU’s PVGIS model gives 951 for a south roof at a typical pitch — the studio stays below it.
Pitch
Shallow (28°) makes 95% of a typical 38° roof; steep (48°) makes 97%.
Shading
A bit of shade costs 10%; heavy shade costs 24%.
How many panels
Two rows, growing with your bill from three columns to eight — six panels up to sixteen.
How much you use yourself
The share of what the roof makes that the house uses: 30% if you’re usually out, 46% in and out, 62% usually home. A battery adds 24 points and a car charger 6, up to 86% — and never more than 62% of your whole year’s use.
Saving
The units you use yourself at 28p, plus the units you export at 6.5p.
Payback
The yearly saving set against what a system like the one you’ve built typically costs to install: a base figure, an amount for each panel, and more again for a battery or a charger. The answer is held between 4 and 25 years. The studio never shows that cost, because only a survey can price your roof — so treat the years as a rough guide, not a figure to hold us to.

Monthly and yearly sunshine for this area: PVGIS 5.2, EU Joint Research Centre. The unit rate, the export rate and the standing charge are the studio’s own assumptions, set in September 2026 — not a tariff we have quoted you. Your own rates are on your bill, and a survey works from those.

The coverage map

Cheshire on the map.

The wires

Who runs the network here.

Which distribution network you sit on decides who signs off the connection, and on what terms.

  • Chester, Ellesmere Port, Neston, Helsby, Frodsham, Runcorn, Widnes, Northwich, Winsford, Tarporley, Middlewich, Knutsford, Crewe, Nantwich and Sandbach are all inside SP Energy Networks’ SP Manweb licence area — the network SPEN describes as the operator “for North Wales, Merseyside, Cheshire and North Shropshire”.

    spenergynetworks.opendatasoft.com
  • SP Energy Networks takes a G98 notification for a single generator under 16A per phase (3.68kW) “before or at the time of commissioning”, and the commissioning confirmation “must be completed and submitted to us within 30 days of commissioning”. Above that threshold the connection has to comply with G99.

    spenergynetworks.co.uk · spenergynetworks.co.uk
  • The east of the county is not SPEN. Macclesfield is on SP Electricity North West, as is Wilmslow bar a handful of homes on its south-western edge that fall in SP Manweb’s area. Warrington is split too: most of the town, including the centre, is on SP Manweb, while Birchwood is served by SP Electricity North West.

    spenergynetworks.opendatasoft.com · electricitynorthwest.opendatasoft.com
  • Congleton is the one place on this page with no network named. It sits on the edge of SP Energy Networks’ area, outside both operators’ open data at the town centre, so the honest answer is to check the distributor ID in the MPAN on the bill, or call 105.

    spenergynetworks.opendatasoft.com · energynetworks.org

Every install is notified to that operator — how G98 and G99 work.

Planning

What the planning rules say here.

Most domestic solar is permitted development, with conditions — and the conditions are not identical on both sides of the border.

  • Rooftop solar on a house in England is permitted development under Part 14, Class A of the GPDO 2015. On the text as amended on 27 August 2026, panels on a pitched roof may protrude no more than 0.2 metres and may not rise above the highest part of the roof, chimneys excluded; on a flat roof the limit is 0.6 metres.

    legislation.gov.uk · legislation.gov.uk
  • Wrexham and Mold are in Wales, where the rules are separate and England’s 27 August 2026 amendment does not apply. Welsh flat-roof panels may not sit “within 1 metre of the external edge of the roof” or “protrude more than 1 metre above the plane of the roof”, and on a wall or pitched roof they “should project no more than 200mm from the roof or wall surface”.

    gov.wales

If your roof is listed, flat or in a conservation area, say so on the first call — it changes the design, not the answer. When solar panels need planning permission, and how panels go on a flat roof.

Council schemes

Council solar schemes in Cheshire.

A search for solar here turns up council-backed group buys as well as installers. They are run by the councils, not by us — this is how each one works.

  • Solar Together Cheshire and Warrington. Cheshire West and Chester, Cheshire East and Warrington councils run a group-buying scheme with iChoosr. Registering is free and carries no obligation; approved installers then bid in a reverse auction, and each household is emailed a personal recommendation before a technical survey. Panels come with optional battery storage and EV charge points, and homes that already have panels can buy a battery on its own. The scheme has run in rounds — the council describes it as having reopened — so check whether registration is open now.

    participatenow.cheshirewestandchester.gov.uk
  • Switch Together. The same scheme under its current name: iChoosr now trades it as Switch Together, “formerly known as Solar Together”, with a Cheshire West and Chester page for solar and battery storage and another for a battery alone.

    switchtogether.co.uk

Whichever route you take, ask for MCS certification — the Smart Export Guarantee depends on it — and for the network notification to be handled for you. How a direct install runs.

Planning authorities

Who decides planning in Cheshire.

6 authorities cover the towns on this page. Each one publishes its own conservation-area map — worth a look before anything goes on a front elevation.

Cheshire · questions

What people ask about Cheshire.

If yours isn’t here, give us a ring and ask, or see every question.

For most of the county it is SP Energy Networks, through SP Manweb. The east is the exception: Macclesfield and nearly all of Wilmslow belong to SP Electricity North West, and Warrington is divided between the two. For any one house the MPAN on your electricity bill settles it — a distributor ID of 13 means SP Manweb, 16 means SP Electricity North West.

Usually not. In England a rooftop array on a house is normally permitted development, provided the panels stand at most 0.2 metres proud of a pitched roof and stay below its highest point. Two things change that: a listed house has no such rights, and in a conservation area a flat-roof array needs prior approval of its appearance, with nothing on a wall, balcony or roof enclosure facing a highway. Cheshire West and Chester has 96 conservation areas and Cheshire East 76, so the council’s map is worth checking before the survey.

Yes. Wales sets its own permitted development rules, so England’s August 2026 changes stop at the border. On a Welsh house, panels on a pitched roof or a wall should stand out 200mm at most and stay below the ridgeline, and a flat-roof array keeps a metre back from the edge and no higher than a metre above the roof. In a conservation area, panels on a principal or side wall seen from the highway need consent, and Cadw’s Cof Cymru shows whether a house is listed.

Seven miles as the crow flies from Ellesmere Port, where we are based, which makes it one of the closest towns we cover: besides Ellesmere Port itself, only Helsby and Neston, at six miles, are nearer. At the far end of the county, Wilmslow, Congleton and Macclesfield are 28 to 32 miles out.

One of six, depending on the town. Cheshire West and Chester covers Chester, Northwich, Winsford, Tarporley, Frodsham, Helsby, Neston and Ellesmere Port; Halton covers Runcorn and Widnes; Warrington has its own borough council; and Cheshire East covers Crewe, Nantwich, Sandbach, Middlewich, Knutsford, Wilmslow, Macclesfield and Congleton. Over the Welsh border, Mold comes under Flintshire and Wrexham under Wrexham County Borough.

It comes down to who you want choosing. Solar Together pools everyone who registers and lets approved installers bid for the group, so the auction sets the price and decides which firm turns up. Going direct, you pick the firm, talk the design through with the people who will fit it, and can ask for a particular battery or charger. Whichever you choose, check the installer is MCS certified and that the network operator gets told about the system.

There is no Cheshire price, because nothing in the cost is tied to the postcode. It follows the roof and the kit: how many panels fit, the pitch, which way the slopes face, what the scaffold has to reach, whether a battery goes in, and whether the system is big enough to need a G99 application. The roof studio on our home page models a system against your own electricity bill, and a survey of the house then turns that into a quote.

All our FAQs

Data last reviewed: September 2026.

From the Google profile

What people say after we have been.

4 of our 39 Google reviews, word for word. The rest are on the reviews page.

Fantastic service from the initial enquiry and all the way through to installation

Very neat job everywhere clean and tidy before they left site.

Everything working as they advised that it would.

Just waiting on the electric supplier to allow us to export the surplus power.

Would fully recommend this family business and have referred them to my neighbours one who has already placed an order.

Dont hesitate to speak to them before you proceed elsewhere!

Peter & Chris Cliffe

Read it in full on Google
Peter CliffeGoogle review · September 2026

We recently had our solar panels and inverter system installed by Electrifyd UK, and the entire process was top-notch from start to finish.

​The initial survey was informative without any pressure tactics, and the installation team arrived right on schedule. They completed the work efficiently, kept the work area clean, and took the time to walk us through the system setup and app monitoring before leaving.

​The system has been running smoothly, and we’re already seeing the benefits. Highly recommend Electrifyd UK to anyone considering switching to solar!

Read it in full on Google
Csaba SzilágyiGoogle review · August 2026

TLDR - Excellent team who provided 5 service throughout at a great price with excellent technical knowledge to deliver a 17.28kW peak solar panel system with 67.5kWh Tesla battery storage

Excellent team at Electrifyd; Andre and Daniel ensured that my solar project was delivered at a great price with support all the way through the planning; installation and after care.

I had a complex installation planned with all 4 roof surfaces to have panels installed and a multiple powerwall 3 set up that needed to work with an existing solar system installed on my garage and eddi solar hot water diverter.

Andre ensured the G99 application was completed quickly and kept me updated on the progress which resulted in approval for 22kW inverter acceptance and a 15kW export limit.

Andre worked with me to provide the highest output of panels that would fit on the roof and meet MCS requirements not just supplying a default panel but looking at the best way to design the system.

The installation went smoothly, Andre and Daniel consulted with me throughout to deliver a neat and minimally intrusive installation. Ensuring all cables were hidden where possible and confirming their route before committing to installation.

Commissioning the system went well and Andre ensured I knew how the Tesla app worked and demonstrated how the system would respond to a grid failure.

The system has performed well so far and has generated 5,653kWh in just under 3 months making my electricity bill negative with SEG export and arbitrage through importing off peak electricity and exporting at peak times.

Andre ensured my Eddi system worked well with the new setup and installed a wireless CT clamp to allow both my existing system and the tesla system to heat the hot water as needed.

After care communication has been good and Andre has answered all questions quickly.

I have recommended Electrifyd to work colleagues because I was happy with the work provided and I would use the team again for future projects.

Read it in full on Google
Daniel HaighGoogle review · June 2026

The additional charging point fitted efficiently and promptly would highly recommend electrifyd

andrew carringtonGoogle review · June 2026

All the reviews, with the replies

The work itself

Three of our own roofs.

Finished arrays from our own jobs.

  • A finished array of black panels on a concrete-tile roof under a cloudy sky
    Panels set square on a concrete-tile roof
  • A long row of black panels on a moss-streaked concrete-tile roof, bird mesh along its edge
    A long row of panels on a concrete-tile roof
  • Black panels on the tiled roof of a house with a first-floor balcony
    An array above a first-floor balcony on a tiled roof

Start here

Start with a conversation, not a quote.

Tell us the postcode and roughly what you use. We’ll tell you honestly whether the roof is worth doing — and if it isn’t, that’s a perfectly good answer too.

Tell us about your roof

What are you after?

Or call 0330 133 6441

Thanks — we have it.

It’s with us now, and we aim to reply within a couple of hours.

  • Takes about a minute
  • You get a person, not a brochure
  • No obligation, and no visit until you ask for one