PaperworkBy ElectrifydUpdated

Solar planning in Wrexham: panels, conservation areas and permission

Solar panels in Wrexham: the planning rules, the council's conservation areas and how to check an address.

Fourteen black panels on a tiled roof in low evening sun, a chimney beside them

Wrexham County Borough Council is the planning authority for Wrexham among the towns we cover. Whether panels on a house there need the council’s permission comes down to two things: the national rules for Wales, and whether the house sits in one of the council’s conservation areas or is listed.

Solar planning in Wrexham: the rules that apply

Wrexham is in Wales, where planning is devolved and England’s August 2026 changes do not apply. Welsh Government guidance is that panels on a wall or pitched roof should project no more than 200mm from the surface, and that a flat-roof array may not sit within 1 metre of the roof’s outside edge or stand more than 1 metre above the plane of the roof. In a conservation area, panels on a principal or side wall seen from the highway need consent, and Cadw’s Cof Cymru record shows whether a house is listed.

Conservation areas in Wrexham

There are currently 23 designated conservation areas within the County Borough.

The areas the council lists, including those named after the towns we cover, are:

  • Wrexham Town Centre
  • Fairy Road (Wrexham)
  • Grosvenor Road (Wrexham)
  • Salisbury Park (Wrexham)
  • Bangor on Dee
  • Bersham
  • Cefn Mawr
  • Chirk
  • Erbistock
  • Gresford
  • Hanmer
  • Hightown Barracks
  • Holt
  • Llanarmon Dyffryn Ceiriog
  • Marchwiel
  • Marford
  • Minera
  • Overton
  • Pen-y-Cae
  • Pontcysyllte Aqueduct
  • Rossett
  • Ruabon
  • Worthenbury

Checking an address: Each area has its own page with a map and a Character Assessment and Management Plan. Read it on Wrexham County Borough Council’s conservation-area page.

Each town we cover in Wrexham has its own pages for solar panels in Wrexham, with that town’s own PVGIS figures, network and conservation areas.

The network side

Planning is one form; the network operator is another. The towns here are on SP Manweb, and every system is notified to the operator under G98 or, for larger systems, G99. Our guide to the G99 application covers it, the Cheshire page sets out the networks town by town, and the UK-wide rules are in our guide to whether solar panels need planning permission.

A car charger has planning rules of its own, which change in England on 21 October 2026: EV charging in Wrexham sets them out with the council’s plug-in car and public charger figures.

If your house is listed, in a conservation area, or has a flat roof, tell us on the first call. It changes the design and sometimes the order things happen in, but rarely whether solar works.

The towns we cover in Wrexham

For each town, what PVGIS estimates a south-facing roof at a 38° pitch makes in a year for every kWp of panels, at that town’s own coordinates.

Start here

Get a quote in Wrexham.

Tell us the postcode and roughly what you use. We’ll tell you honestly whether the roof is worth doing — and if it isn’t, that’s a perfectly good answer too.

Tell us about your roof

What are you after?

Or call 0330 133 6441

Thanks — we have it.

It’s with us now, and we aim to reply within a couple of hours.

  • Takes about a minute
  • You get a person, not a brochure
  • No obligation, and no visit until you ask for one