Solar planning in Halton: panels, conservation areas and permission

Solar panels in Halton: the permitted development rules, Halton Borough Council's conservation areas and how to check yours, and the towns we cover there.

Fourteen black panels on a tiled roof in low evening sun, a chimney beside them

Halton Borough Council is the planning authority for Runcorn and Widnes among the towns we cover. Whether panels on a house there need the council’s permission comes down to two things: the national rules for England, and whether the house sits in one of the council’s conservation areas or is listed.

Solar planning in Halton: the rules that apply

In England, panels on a house are normally permitted development under Part 14, Class A of the General Permitted Development Order 2015, as amended on 27 August 2026. On a pitched roof they may stand no more than 0.2 metres proud and no higher than the roof’s highest point; on a flat roof the array may rise no more than 0.6 metres above it; on a wall, 0.2 metres where it abuts a highway and 0.4 metres elsewhere. A listed house has no such rights, and in a conservation area nothing may go on a wall, balcony or roof enclosure that fronts a highway; a flat-roof array on that land needs the council’s prior approval of its appearance first.

Conservation areas in Halton

There are 10 Conservation Areas in Halton.

Checking an address: The council does not list the areas by name on its conservation page; its online map has a Conservation Areas layer. Read it on Halton Borough Council’s conservation-area page.

Each town we cover in Halton has its own pages for solar panels in Runcorn and the rest, listed below the article, with that town’s own PVGIS figures, network and conservation areas.

The network side

Planning is one form; the network operator is another. The towns here are on SP Manweb, and every system is notified to the operator under G98 or, for larger systems, G99. Our guide to the G99 application covers it, the Cheshire page sets out the networks town by town, and the UK-wide rules are in our guide to whether solar panels need planning permission.

A car charger has planning rules of its own, which change in England on 21 October 2026: EV charging in Halton sets them out with the council’s plug-in car and public charger figures.

If your house is listed, in a conservation area, or has a flat roof, tell us on the first call. It changes the design and sometimes the order things happen in, but rarely whether solar works.

Start here

Get a quote in Halton.

Tell us the postcode and roughly what you use. We’ll tell you honestly whether the roof is worth doing — and if it isn’t, that’s a perfectly good answer too.

Tell us about your roof

What are you after?

Or call 0330 133 6441

Thanks — we have it.

It’s with us now, and we aim to reply within a couple of hours.

  • Takes about a minute
  • You get a person, not a brochure
  • No obligation, and no visit until you ask for one